 |
| |
The installation of the FSM726S Managed Stackable Switch includes the following steps:
1. Rack-mounting and stacking multiple units
2. Daisy-chaining multiple units using LVDS stacking cables
3. Applying AC power
This chapter describes these procedures. Learning objectives for this chapter are specified on the next page.
| |